Sailing With Josh

Archives

List of to-dos: Me Day 2 – Inspect bottom, photos, future haul out to-dos list Day 3 – Disassemble, Inspect, Reassemble Bow Platform, Bowsprit, Anchor Chafe Guards, Change Zinc on the rudder pintle Day 4 – Disassemble, Inspect, Lubricate, Reassemble Seacocks, Inspect, Lubricate Motor Mount Day 5 – Prep boat for floating Day 6 – Check the through Hulls upon float and return to slip The Yard Day 2 –  Waterline – Strike and… Read More

This morning I had a haul-out for the Flicka scheduled at the Yard in Ballard at 9am. It started snowing at about 7pm last night and the temperature dropped below freezing overnight. I awoke this morning to an inch of snow at 27 degrees. The heat was on overnight so there was chunky layer of ice between the deck and the snow. I went and got some coffee and stopped by the boat… Read More