Sailing With Josh

Archives

List of to-dos: Me Day 2 – Inspect bottom, photos, future haul out to-dos list Day 3 – Disassemble, Inspect, Reassemble Bow Platform, Bowsprit, Anchor Chafe Guards, Change Zinc on the rudder pintle Day 4 – Disassemble, Inspect, Lubricate, Reassemble Seacocks, Inspect, Lubricate Motor Mount Day 5 – Prep boat for floating Day 6 – Check the through Hulls upon float and return to slip The Yard Day 2 –  Waterline – Strike and… Read More