Sailing With Josh

Hi, folks. I have an article published on Latitude 38‘s electronic version of their magazine ‘Lectronic Latitude. Special thanks to Tim Henry for giving it a go. Click on the logo...

After lowering the mast on Sampaguita, my 1985 Flicka 20, disassembly was next. All was well until the shroud and stay tang assemblies. Even installed, I could see there was galvanic...

It’s time to do some work on the Sampaguita, starting with the mast. I had the mast down in 2014 for some minor work, but there will be a bit more...

If you are interested in more information about the Pacific Seacraft Flicka 20 sailboat beyond what this blog has to offer, check out the following links. There are some great pictures,...

I was rinsing down the anchor gear on deck of Sampaguita, my 1985 Pacific Seacraft Flicka 20, back in my home port when a dock mate walked by. He asked,” how much...

Visiting Port Townsend and closing the circle on my circumnavigation of Vancouver Island. Hanging at Admiral Ship Supply with a friend and the Lady Washington is on the hard right in...

I replaced the neoprene/epdm seal on the removable cockpit sole lid. This lid exists to access the inboard motor of Pacific Seacraft sailboats. Since I have an outboard, this space is...

A new propane solenoid and rewired stern light. The project is not completely done in this picture but it is now. You can see the jug of distilled water as I...

List of to-dos: Me Day 2 – Inspect bottom, photos, future haul out to-dos list Day 3 – Disassemble, Inspect, Reassemble Bow Platform, Bowsprit, Anchor Chafe Guards, Change Zinc on the rudder...

This morning I had a haul-out for the Flicka scheduled at the Yard in Ballard at 9am. It started snowing at about 7pm last night and the temperature dropped below freezing overnight....